• mkwt@lemmy.world
      link
      fedilink
      arrow-up
      0
      ·
      9 months ago

      There was an early news story where the subcontractor claimed that it wasn’t their responsibility to tighten the door plug bolts before delivering the entire fuselage subassembly to Boeing.

      I haven’t been keeping up with this news in detail, so it certainly seems plausible to me that some planes were found to be missing bolts entirely.

      • BCsven@lemmy.ca
        link
        fedilink
        arrow-up
        0
        ·
        9 months ago

        This one said the informal log showed they had to remove the door module ( thus bolts ) but no record of reinstalling them…and they run two logging systems so not all info is captured in the other.

      • PsychedSy@sh.itjust.works
        link
        fedilink
        arrow-up
        0
        ·
        9 months ago

        It gets installed before the fuselage goes onto the railcar at Spirit Aerosystems and Boeing removes it while they finish the interior.

      • PeriodicallyPedantic@lemmy.ca
        link
        fedilink
        arrow-up
        0
        ·
        9 months ago

        I remember reading the same thing, and iirc they were right. The subcontractor builds the fuselage and delivers it to boeing.

        Boeing then opens up whatever doors and plugs will make it easier to install the interior. Once the interior is installed, they’re supposed reinstall and secure all the doors and plugs. Because Boeing is going to be opening them all up, they don’t bother to fully secure them.

        That said, it sounds like a process that’s just asking for miscommunication. If you expect the part to be removed, just deliver the part separately. If you put the part in it’s place, then fully install it and secure it.

        • mkwt@lemmy.world
          link
          fedilink
          arrow-up
          0
          ·
          9 months ago

          If I remember right, these fuselage assemblies get transported on a giant beluga-looking airlift airplane. Where the whole nose is the plane opens up to swallow fuselage sections whole.

          If you ship the door plugs uninstalled, you’re probably looking at a while separate shipment.

        • SpeakinTelnet@programming.dev
          link
          fedilink
          arrow-up
          0
          ·
          9 months ago

          It’s a pretty standard process to have some parts installed “loose” and tightened at a later time. It could be to ensure figment, add rigidity or even just to protect the mating surfaces from the elements during transport.

          Also it’s probably not just because Boeing is gonna open them up that they don’t fully secure them. I haven’t seen the specs but it’s quite common to have a reinspection requirements when disassembling something that was fully installed for stress and damage.

          Pretty much nothing in aerospace is left to commjnications. The assembly manuals are not just complete, they are painfully exhaustive.

          • PsychedSy@sh.itjust.works
            link
            fedilink
            arrow-up
            0
            ·
            9 months ago

            It’s much easier to temp install parts than design tools to hold the parts on the rail car or ship them in crates.

            The wingbox gets corrugated plastic covers to keep the elements out during shipping. The wingbox doesn’t exactly need help being stout, though.

          • BCsven@lemmy.ca
            link
            fedilink
            arrow-up
            0
            ·
            9 months ago

            This one said the informal log showed they had to remove the door module ( thus bolts ) but no record of reinstalling them…and they run two logging systems so not all info is captured in the other.

      • gravitas_deficiency@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        0
        ·
        9 months ago

        The latest iteration of the data I’ve found is that Boeing and Spirit (the subcontractor) used different QC systems that weren’t fully compatible; one of the areas of incompatibility is around manufacturing and maintenance procedures of the plug door, and nobody put a process in place to account for that (if you’re in tech, you know that means it was considered “tech debt” that can be fixed “later”).

  • fastandcurious@lemmy.world
    link
    fedilink
    arrow-up
    0
    ·
    edit-2
    9 months ago

    Now they want us to believe it’s safe, and they did literally nothing to inspect all the planes to make sure they actually were, it seems like the grounding was just a formality to please the general public, i can guarantee that they are gonna sweep under the rug even loosely fitted engines and make the excuse ‘but we weren’t going to fly it through the pacific’

    • wrath_of_grunge@kbin.social
      link
      fedilink
      arrow-up
      0
      ·
      9 months ago

      Narrator: [20:35] A new car built by my company leaves somewhere traveling at 60 mph. The rear differential locks up. The car crashes and burns with everyone trapped inside. Now, should we initiate a recall? Take the number of vehicles in the field, A, multiply by the probable rate of failure, B, multiply by the average out-of-court settlement, C. A times B times C equals X. If X is less than the cost of a recall, we don’t do one.
      Woman on Plane: Are there a lot of these kinds of accidents?
      Narrator: You wouldn’t believe.
      Woman on Plane: Which car company do you work for?
      Narrator: A major one.