I mean asphalt, blacktop, tarmac, macadam, bitumen, pavement, or tar and stone and they are all the same thing. It can be driven on as soon as it is laid down on the street but has to be cured for a week in a driveway. Why would anyone think wet concrete aka Rigid Pavement could be driven on as soon as it is laid down?
I mean asphalt, blacktop, tarmac, macadam, bitumen, pavement, or tar and stone and they are all the same thing. It can be driven on as soon as it is laid down on the street but has to be cured for a week in a driveway. Why would anyone think wet concrete aka Rigid Pavement could be driven on as soon as it is laid down?